Construction Planning and Control

Relevant Course: Project Management 

Relevant Department: Civil Engineering

 Relevant Semester: 6th or 7th

Pre- requisite : Basic Courses in Building Materials & Building Construction

Course Description & Outline :

     Lectures will cover basic concepts required to develop a resource loaded plan based on the Critical Path Methodology.

Schedule for Lecture Delivery

Session 1 :24-Aug-2015 (10-12 noon)

Session2 :25-Aug-2015 (10-12 noon)

Session3 : 26-Aug-2015 (10-12 noon)

Teacher Forum

Video Lectures for Session 1

Introduction

Construction Project Characterstics

Project Stakeholder and Project Phases

Project Management

Process & Project Management and Project Objectives

Project Time Management

GANTT Chart

Forum for Session 1

Forum for Session 1

Forum not available

Construction Project Characterstics

Lecture 1- PDF

 

Forum for Construction Project Characterstics

Forum for Construction Project Characterstics

Forum not available

Introduction

Forum for Introduction

Forum for Introduction 

Forum not available

Video Lectures for Session 2

Recall & Indian Standards 15833

Networks-AoA

Calculating Float/Slack.

Handout for Session 2

Forum for Session 2

Forum for Session 2

Forum not available

Brief History of Scheduling

Forum for Brief History of Scheduling

Forum for Brief History Of Scheduling

Forum not available

Work Breakdown Structures

Forum for Work Breakdown Structures

Forum for Work Breakdown Structures

Forum not available

Basic CPM Calculations

 

Forum for Basic CPM Calculations

Forum for Basic CPM Calculations

Forum not available

Schedule Float

This paper is a core reference in our PMI-SP and PTMC credential courses.

Forum for Schedule Float

Forum for Schedule Float

Forum not available

Video Lectures For Session 3

Recall & Scheduling/Planning Engineer Responsibilities

Network Analysis-Example 2 and Projects and Resources

Problem 2- Resource

Problem 3 - Two resources

Handout for Session 3

Forum for Session 3

Forum for Session 3

Forum not available

Quiz - I

Quiz - I

Quiz not avilable

Quiz - II

Quiz - II

Quiz not avilable

Quiz - III

Quiz - III

Quiz not avilable

Assignment

Problem 1: Compound wall

Part A:

Figure below shows a small compound wall that has to be constructed.

 The sequence is as follows

 Excavation -> laying of footings (starts after excavation activity finishes) -> Laying of plinth beam (starts after footing activity finishes) -> column casting (starts one day after the start of footing activity)             ->brickwork activity (starts one day after start of column activity) -> plastering of walls &columns (starts after brick work activity finishes)  ->painting of walls& columns (starts after plastering activity finishes)

 The duration, start date, end date and cost of each activity is given in the table below. Draw a Gantt chart showing the

(i)                 Activity timeline

(ii)               Daily cost of work

(iii)             Cumulative cost curves.

              (Activity cost may be assumed distributed equally along  activity duration) 

Part B:

Table given below shows the activities, predecessor relationship for compound wall. Here the brickwork, plastering and painting is done for each section as a separate activity.

Do the forward pass, backward pass for the network

Part C :    Find

  • Whether the activities are critical (Y/N)
  • Critical path
  • Total float, Free float, Interfering float and independent float for each activity  

       (Note*: negative Independent float should be  considered  as zero)

Part – D: 

For the resource histogram developed in PART-A now the column activity has a float of 2 days, the Labor resource requirement for each activity is 2 persons/day and the daily resource limit of 4 persons/day.  

a)      Draw a resource loaded bar chart and histogram and highlight resource over location.

b)      Draw a resource loaded bar chart and histogram and show the over allocation can be solved using floats.

Problem 2: Two span bridge

Part – A:

Picture below shows a two span bridge. The activities for construction of the bridge with relationships is listed in table 1. Draw the network diagram showing the relationships

 Do the forward pass and backward pass , find the critical activities  and  floats ( Total float, free float, interfering float and independent float )

 (Note*: negative Independent float should be  considered  as zero)

 

Part – B:

 Do the forward pass and backward pass , find the critical activities  and  floats ( Total float, free float, interfering float and independent float (Note*: negative Independent float should be  considered  as zero)

Part – C:

Draw a resource loaded bar chart and histogram considering only the first four activities. The labor resources required for activity first activity (order and deliver piles) is 2 per day and for other activities it is 1 per day. The resource available resource is only 3 per day. Using the float of Activity 2(cast beams), illustrate by means of histogram and bar chart how would you level the resource?  